GS980MX Series Installation Guide for Virtual Chassis Stacking
121
3. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 67.
Figure 67. Installing the Switch in an Equipment Rack
4. After installing all switches of the stack, do one of the following:
To build the stack with the default stacking ports, refer to Chapter
7, “Building the Trunk with the Default 10Gbps Stacking Ports” on
page 141.
To build a stack of GS980MX/10HSm, GS980MX/18HSm,
GS980MX/28PSm, or GS980MX/52PSm using 5Gbps ports for the
trunk, refer to Chapter 8, “Configuring the Master of the Stack
Trunk with 5Gbps Multi-Speed Ports” on page 161 and Chapter 9,
“Configuring the Member(s) of the Stack Trunk with 5Gbps Multi-
Speed Ports” on page 199.