Use of the implement
Condor 12001-C/15001-C BAH0030-4 07.15
149
10.3 Work commencement
Fig. 185
DANGER
Direct persons out of the danger area of the implement, in
particular from the swivel zone of the implement booms and the
rear frame.
Only actuate the tractor control units from inside the tractor cab!
1. Unfold the implement and the star wheel into working position
(see section "Unfolding/folding the implement boom", Seite 138).
When lowering the rear frame, pull the implement forward slightly.
2. Actuate the red tractor control unit.
Switch on the blower fan.
3. Check the fan speed and correct if necessary
(see section "Adjusting blower fan speed", Seite 117).
4. Align the implement approximately horizontal.
4.1 Lower/raise the tractor lower links.
5. Check the tramline rhythm/tramline counter and correct if
necessary (see AMALOG
+
operating manual).
6. Start.
7. Check the placement depth of the seed and correct if necessary
(see section "Checking the seed placement depth", Seite 150)
after 100 m
after changing from light to heavy soil and vice-versa.