1. To the shifted tramline,
see "ISOBUS software operating manual" >
"Configuring the tramline control".
2. After the shifted tramline,
check whether the desired coulters are shifted.
The large spacer elements
are 38 mm wide. The
small spacer elements
are 25.4 mm wide.
3. To adjust the tramline width for the cultivating
implement,
add the desired spacer elements
or
remove the desired spacer elements.
CMS-I-00005546
6.4.21 Using the loading board
1. Remove the safety cotter pin
.
CMS-I-00002744
2. Pull out the ladder
and swivel it down.
CMS-I-00002836
CMS-T-00003737-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
143