10. When the î§îîî level rises beyond the edge of the
inspection window,
reduce the filling auger speed with the ball valve
.
11. When the fertiliser hopper is full,
slowly switch off the filling auger with the ball
valve
.
12. Switch off the "beige" tractor control unit.
13. Swivel in the filling chute.
14. Close the cover tarpaulin of the filling funnel.
6.4.4 Preparing the micropellet spreader for operation
6.4.4.1 Filling the micropellet hopper
REQUIREMENTS
The micropellets are free of foreign objects
The micropellets are dry and do not stick
IMPORTANT
Leaks in the hopper cause faulty
placement
Do no walk on the hopper cover.
Keep the cover seal and sealing surface
clean.
1. Press down the micropellet hopper cover
.
2. Unlock the
fastener.
CMS-I-00002595
CMS-T-00003596-C.1
CMS-T-00003595-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
70