Amazone Precea 3000 - Adjusting the Micropellet Metering Unit Bottom Flap

Amazone Precea 3000
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. Insert the roller cage
1
along with the metering
roller into the metering housing.
CMS-I-00002584
15. Insert the drive unit
1
into the metering roller.
16. Rotate the drive unit clockwise.
17. Close the metering unit cover.
The locking mechanism engages.
18. Set the sliding shutter to the top position.
19. Move the bottom flap lever to the working
position.
CMS-I-00002585
9.1.27
Adjusting the micropellet metering unit bottom flap
INTERVAL
Every 100 operating hours
or
Every 12 months
1. Move the bottom flap lever
3
into working
position.
2. To adjust the pre-tension,
the bolt head
1
should be 9 -10 mm above the
clamping lever
2
.
CMS-I-00002581
CMS-T-00003602-A.1
9 | Repairing the machine
Maintaining the machine
MG6660-EN-II | D.1 | 27.09.2021
206