6.3 Coupling the implement
6.3.1 Coupling the supply lines to the hose package
1. To connect the conveyor hose
to the hose
package
,
couple the connecting piece with the bracket
.
2. Depending on the implement equipment, connect
the second conveyor hose to the hose package.
Pay attention to the markings on the conveyor
hoses.
3. Depending on the implement equipment, connect
the front hopper supply
to the hose package.
4. Depending on the implement equipment, connect
the metering unit shutoff
to the hose package.
CMS-I-00003124
6.3.2 Attaching the lower link ball sleeves
6.3.2.1 Attaching the lower link ball sleeves for mounting category 2
1. Insert the lower link step pin
into the mount
from the outside.
2. Equip the lower link step pins with ball sleeves
.
3. Secure the lower link step pin
with a linch pin.
CMS-I-00001885
6.3.2.2 Attaching the lower link ball sleeves for mounting category 3
1. Insert the lower link step pin
into the mount
from the outside.
2. Equip the lower link step pins with ball sleeves
.
3. Secure the lower link step pin with a linch pin
.
CMS-I-00001884
CMS-T-00005897-B.1
CMS-T-00004439-B.1
CMS-T-00002085-A.1
CMS-T-00002089-A.1
CMS-T-00002084-A.1
6 | Preparing the machine
Coupling the implement
MG6660-EN-II | D.1 | 27.09.2021
59