3. Open the micropellet hopper cover
.
4. Fill the micropellet hopper.
CMS-I-00002598
5. Clean the cover seal and sealing surface
.
6. Close the micropellet hopper
.
The lock engages noticeably.
CMS-I-00002596
6.4.4.2 Replacing the metering roller
1. Set the sliding shutter
to the bottom position.
CMS-I-00002586
CMS-T-00003598-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
71