BD FocalPoint™ GS Imaging System Instrument User’s Manual
182
Figure 19-1 – BD FocalPoint™ Slide Profiler QA program
19.1.1 Pre-Installation
Before installing a BD FocalPoint™ Slide Profiler, a BD-designated service representative
performs an inspection of your facility during which any necessary modifications to the facilities,
such as the installation of dedicated power and/or telephone lines, are identified. This
representative will also obtain a copy of your staining protocol and general information about
your cytology laboratory processes and procedures for analysis and reference. Figure 19-2
illustrates the activities that take place during the pre-installation phase.
Figure 19-2 – Pre-installation phase activities
Laboratory
Installation Phase
Laboratory
Process
Adjustment
Slide
Preparation
Compatibility
Assessment
System
Installation
and
Calibration
BD Diagnostics
Facility
Inspection
Operator
Training
System
Operation
Automated
Calibration and
System Integrity
Monitoring
Process Integrity
Monitoring
Automated
Logging to the
System Log
Post-installation
Phase
Pre-installation Phase
Laboratory
Process
Information
Process Change
Recommendation
Modify Facility,
If Required
Check power, phone lines, and other
physical requirements
Pre-Installation
Inspection of Facility