EasyManua.ls Logo

BD FocalPoint GS - BD Focalpoint Slide Profiler Installation Checklist; BD Focalpoint Instrument or Device; Workstation; Electronic Cables

Default Icon
242 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
193
20 BD FocalPoint Slide Profiler Installation Checklist
When the BD FocalPoint™ Slide Profiler is installed in your laboratory, ensure that all the
necessary components are present.
The BD FocalPoint™
system consists of the following components:
20.1 BD FocalPoint™ Instrument or Device
Instrument
Slide trays
20.2 Workstation
Computer (CPU)
Monitor
Keyboard
Mouse and Mouse pad
Cart
Ethernet hub (optional)
Modem or Router
Printer
20.3 Electronic Cables
Ethernet
Printer to CPU
BD FocalPoint™ system to CPU
Monitor to CPU
Modem or Router to CPU
Keyboard to CPU
Power strip
Power cords:
Instrument
Printer
CPU
Monitor
Modem or Router
Ethernet hub (optional)
20.4 Additional Items Supplied at Startup
Printer paper (starter package)
Head cleaning tape (1)
One roll of slide barcode labels provided per site
Line protector and/or power supply (optional, at additional cost)
Switch Slides (as appropriate for laboratory)

Table of Contents