EasyManua.ls Logo

Brother CS5055PRW - Removal of BH Switch Assy; Removal of Thread Take-Up Lever Link

Brother CS5055PRW
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - 35
Needle-presser module
Application of Disassembly
Application
4 Removal of BH switch assy
1. Remove the screw 1, and then remove the BH switch assy. 1.
1
1
5 Removal of Thread take-up lever link
1. Remove the screw 1, and then pull the take-up support shaft 1, and then
remove the washer, spring 2 and the thread take-up lever link 3.
*Key point
Pull the thread take-up lever link 3 from the shaft of the
thread take-up lever 4.
2. Remove the retaining ring E5 from the take-up support shaft 1.
2
1
3
Retaining ring E5
1 1
4

Table of Contents

Other manuals for Brother CS5055PRW

Related product manuals