EasyManua.ls Logo

Canrig PC3000 - Part Name: Carrier Pipe Kicker Mount

Default Icon
428 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintanance, Service, and Troubleshooting
Canrig Drilling Technology Ltd. 6-23
Inspection Indication Map
Part Name: Carrier Pipe Kicker Mount
Procedure:
Perform a Dry Magnetic Particle Inspection on all welds shown in accordance with ASTM E709.
Acceptance criteria are as defined in ASTM E709. All other areas not indicated must be visually examined
for damage and signs of fatigue.
The following information should be supplied on the Inspection Report as minimum:
Purchase Order #:
Date:
Inspection Report #: Canrig Part #:
Inspector Signature/Stamp: Power Catwalk S/N:
Type of Inspection: Canrig Representative:

Table of Contents

Related product manuals