EasyManua.ls Logo

Canrig PC3000 - Component Maintenance and Schedules; Maintenance Schedule; Daily Cleaning and Inspection

Default Icon
428 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintanance, Service, and Troubleshooting
Canrig Drilling Technology Ltd. 6-1
Component Maintenance and Schedules
This section describes equipment maintenance and contains inspection checklists that can be kept as
equipment records. The troubleshooting aids at the back of the manual can be used to pinpoint problems
with the equipment.
Maintenance Schedule
Daily cleaning and inspection.
Greasing procedure.
Skate winch cable tension adjustment.
Carrier winch in accordance with Appendix 1 (CD Version Only).
Wireless control in accordance with Appendix 2 (CD Version Only).
Daily Cleaning and Inspection
The following is to be performed on a daily basis.
1. Turn off the system and lock out the electrical power.
Warning!
BEFORE the carrier is elevated and
personnel are positioned under the carrier,
place the safety stop bar behind the flare end
of the carrier, and ensure it protrudes through
the holes on both sides of the inner Catwalk wall
to prevent lowering of the carrier (Figure 6-1).

Table of Contents

Related product manuals