EasyManua.ls Logo

Chroma A620028 - Page 182

Default Icon
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Programmable DC Power Supply (with Solar Array Simulation) 62000H Series
Operating & Programming Manual
5-12
STEP 2
Input cmd and click OK to run the cmd program.
STEP 3:
When the MS-DOS environment is entered in STEP 2, test the IP address by pinging it
directly by entering ping IP address, i.e., ping 10.1.9.20”. If there is a response, it means the
local area network setup has been successfully completed.

Table of Contents

Related product manuals