Table 5 ( Continuation ): CVM-Bx measurement parameters.
Parameter Units
Phases
L1-L2-L3
N
Total
III
Maximum Apparent Power Demand, Tariff 1 kVA
Maximum Current Demand, Tariff 2 A
Maximum Active Power Demand, Tariff 2 kW
Maximum Apparent Power Demand, Tariff 2 kVA
Maximum Current Demand, Tariff 3 A
Maximum Active Power Demand, Tariff 3 kW
Maximum Apparent Power Demand, Tariff 3 kVA
Phase sequence
Parameter Units
Tariff:
T1-T2-T3
Total Tariff
No. of hours of active tariff hours
Cost COST
CO
2
Emissions kgCO
2
4.3.- KEYPAD FUNCTIONS
The CVM-B has 3 keys that allow you to browse the various screens and program the unit.
Table 6: Function of keys.
Key Keystroke
Shifting to the left
Shifting to the right
Select parameter / Enter programming menu
28
CVM-B100 - CVM-B150
Instruction Manual

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Circutor CVM-B100 and is the answer not in the manual?

Circutor CVM-B100 Specifications

General IconGeneral
BrandCircutor
ModelCVM-B100
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals