Table 5 ( Continuation ): CVM-Bx measurement parameters.
Parameter Units
Phases
 L1-L2-L3
N
Total
III
Maximum Apparent Power Demand, Tariff 1 kVA
 
Maximum Current Demand, Tariff 2 A
 
Maximum Active Power Demand, Tariff 2 kW
 
Maximum Apparent Power Demand, Tariff 2 kVA
 
Maximum Current Demand, Tariff 3 A
 
Maximum Active Power Demand, Tariff 3 kW
 
Maximum Apparent Power Demand, Tariff 3 kVA
 
Phase sequence
Parameter Units
Tariff: 
T1-T2-T3
Total Tariff
No. of hours of active tariff hours
 
Cost COST
 
CO
2
 Emissions kgCO
2
 
 4.3.- KEYPAD FUNCTIONS
The CVM-B has 3 keys that allow you to browse the various screens and program the unit.
 
Table 6: Function of keys.
Key Keystroke 
Shifting to the left
Shifting to the right 
Select parameter / Enter programming menu
28
CVM-B100 - CVM-B150
Instruction Manual