EasyManua.ls Logo

Dieci Pegasus - Record of Scheduled Inspections and Maintenance Work

Dieci Pegasus
320 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D/59
- CAUTION: - Read the SAFETY REGULATIONS (in this manual) carefully for the safety of all personnel and the machine.
RECORD OF SCHEDULED INSPECTIONS
AND MAINTENANCE WORK
h
h
Empty diesel tank
Check for leaks on hydraulic system pipes
Lubricate boom joint pin.
Lubricate pivot foot pins/jack head.
Lubricate lifting foot pins/jack head.
Lubricate levelling foot pins/jack head.
Lubricate stabiliser foot pins/jack head.
Lubricate stabiliser assembly pins.
Lubricate turret rotation swing gear.
Lubricate front and rear wheel pivot pins.
Lubricate front/rear axle oscillation bushings.
Lubricate spiders and Cardan joints on drive shafts.
Lubricate boom sliding blocks.
50
100
Clean air lter
Lubricate differential axles
Check tyre pressure
Check tightening torque of nuts and bolts in general
Check radiator is not clogged
Check brake oil level
Check boom chain condition and elongation.
Check stickers
Date Signature
Date Signature
Job
Job accomplished
REGULAR MAINTENANCE SPECIAL MAINTENANCE
Job description
Machine
working hours
REGULAR MAINTENANCE SPECIAL MAINTENANCE
Job
Job accomplished
Job description
Machine
working hours
Date Signature
Date Signature
- CAUTION -
The maintenance work in bold type is considered
fundamental by DIECI for people’s safety.
- CAUTION -
Maintenance must be carried out by qualied personnel
who must sign the scheduled maintenance report.

Table of Contents

Other manuals for Dieci Pegasus