Proline Promass E 500 PROFIBUS PA Commissioning
Endress+Hauser 105
10 Commissioning
10.1 Post-mounting and post-connection check
Before commissioning the device:
‣
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-installation" check→ 34
• Checklist for "Post-connection" check→ 63
10.2 Switching on the measuring device
‣
Switch on the device upon successful completion of the post-mounting and post-
connection check.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or if a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 183.
10.3 Connecting via FieldCare
• For connecting FieldCare → 86
• For connecting via FieldCare → 90
• For user interface of FieldCare → 90
10.4 Configuring the device address via software
In the "Communication" submenu the device address can be set.
Navigation
"Setup" menu → Communication → Device address
10.4.1 PROFIBUS network
At time of delivery, the measuring device has the following factory setting:
Device address 126
• To display the current device address: Device address parameter → 112
• If hardware addressing is active, software addressing is blocked → 60
10.5 Setting the operating language
Factory setting: English or ordered local language