EasyManua.ls Logo

Fujitsu PRIMERGY BX924 S4 - Processor Removal and Heat Sink Handling

Fujitsu PRIMERGY BX924 S4
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
186 Upgrade and Maintenance Manual BX924 S4
Processors
© cognitas. Gesellschft für Technik-Dokumentation mbH 2013 Pfad: C:\Programme\FCT\tim_app\tim_local\work\PICHOL\OBJ_DOKU-20568-001.fm
9.3 Removing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
9.3.1 Required tools
Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
Phillips PH2 / (+) No. 2 screw driver
Removing the processor: tool-less
9.3.2 Preliminary steps
Before removing a processor, perform the following steps:
Ê Disable BitLocker functionality as described in section "Disabling BitLocker
functionality" on page 66.
Ê Disable boot watchdog functionality as described in section "Disabling boot
watchdog functionality" on page 67.
Ê If applicable, open the rack door as described in section "Opening the rack
door" on page 51.
Ê Locate the desired server blade as described in section "Locating the
defective server blade" on page 43.
Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes

Table of Contents

Related product manuals