BX924 S4 Upgrade and Maintenance Manual 269
System board components
Figure 123: Installing the system board (B)
Ê Secure the system board with the screw (M3 x 6 mm, C26192-Y10-C68)
(see circle).
I Screw torque: 0.6 Nm (not applicable for the Japanese market)
Ê Verify the settings on the new system board (jumpers and/or switch).
I For a detailed description, please refer to section "Onboard settings"
on page 279.
10.5.5 Concluding steps
Ê If applicable, reinstall the air cowls as described in section "Handling of
memory air cowls" on page 170.
Ê Reinstall all remaining system board components as shown in the related
sections:
– Mezzanine cards with carrier: refer to section "Installing mezzanine
cards" on page 134
I Install all expansion cards into their original slots.
– TPM (if applicable): refer to section "Installing the TPM" on page 243
Ê Close the server blade as described in section "Closing the server blade" on
page 56.