Appendix A - Installing RTP
4. Connect field wiring, as shown below.
ATTENTION: Short connect terminal 30 and 31 as shown in the diagram
above.
See "Terminal Block-to-Field (Signal) Wiring" on page106 for more
information.
Using an RTP to field wiring the UAI
ATTENTION:
l RTP is not for use with thermocouples.
l RTP and cables are intended for permanent installation within their own
enclosure.
To wire the UAI using an RTP
1. Mount the RTP cable assembly to ControlEdge 900 Controller. See the
following figure for the example installation diagram.