6. Tighten the thumbscrews with a T-25 Torx screwdriver to secure the frame to the rack.
7. Repeat the procedure for the remaining frames.
NOTE: NOTE: Up to four 10U frames can be installed in a 42U rack. If you are installing more than one frame, install the
first frame in the bottom of the rack, and then install additional frames by moving up the rack with each subsequent
frame. Plan rack installation carefully because it is difficult to change the location of components after they are
installed.
Installing the frame into the rack 78

Table of Contents

Other manuals for HP HPE Synergy 12000 Frame

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP HPE Synergy 12000 Frame and is the answer not in the manual?

HP HPE Synergy 12000 Frame Specifications

General IconGeneral
Form FactorRack-mountable
Maximum Compute Modules12
Management ModuleHPE Synergy Composer
CoolingRedundant fan modules
Power SupplyRedundant power supplies
NetworkingHPE Synergy 12000 Frame Interconnect
Product TypeBlade Enclosure
Width44.5 cm
ComplianceFCC, VCCI, BSMI, CCC, KCC, RoHS
Depth36.25 in (92.08 cm)