3. See Figure 17. Align the expansion housing with the machine unit, matching
the tabs on the unit with the slots on the housing.
4. Slide the UPS forward into the expansion housing to lock into place.
Attention: Be sure the expansion housing is fully latched onto the system
unit.
Figure 17. Aligning the expansion housing with the system unit
Updated October 31, 2007
Chapter 2. Installation and system setup 29