140 User Manual QuickTOC
®
purity
ATEX 2 04E3920
8 Care and Maintenance
8.3 Care and Maintenance Tasks LAR | PROCESS ANALYSERS AG
Use a copy of the "Maintenance Protocol (Analyser)" for maintenance purposes, which you will find in
Chapter 13.4 on page 179.
3 months Check reactor pipe end and
clean if necessary
Inspection of the gas coo-
ling pipes
Check pump cassettes and
clean if necessary
Check the rollers of the
pump head for ease of
movement
Checking the measured
values with standard solu-
tion
Check and document analy-
ser status
Perform a measurement
and check the values
if neces-
sary
Check viton tubes and
replace if necessary
Date: Signature:
Interval Measure
Task
completed
Notes
3 months Clean and grease bearing
pin
6 months Replace pump tubes and
condensate tubes
1 year Replace reactor tube or
change reactor filling (if
necessary)
Replace loop tubing
Change sample drain tubes
(if necessary)
Change quartz wool filling
Replace the pre-detector
gas filter 0.1 μ
Date: Signature
Interval Measure
Task
completed
Notes