EasyManua.ls Logo

LAR Process Analysers QuickTOC purity - Connecting the Furnace Emergency Cooling; Switch on the Analyser

LAR Process Analysers QuickTOC purity
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74 User Manual QuickTOC
®
purity
ATEX 2 04E3920
5 Start-up
5.12 Connecting the Furnace Emergency Cooling LAR | PROCESS ANALYSERS AG
5.12 Connecting the Furnace Emergency Cooling
Connect the furnace emergency cooling.
Fig. 48: Connection of the furnace emergency cooling
5.13 Switch on the Analyser
The analyser is switched on for the first time by Technical Support of LAR or by a person authorised by
LAR.
Preconditions:
Completion of installations (Chapter 4 from page 29)
Removal of transport locks (Chapter 5.4 from page 63)
Switch-on of internal fuses (Chapter 5.6 on page 65)
Filling and installation of the reactor pipe (Chapter 5.7 from page 65)
1. Before the measuring mode is started, the control unit produces the pressurized enclosure.
2. Close the analyser (if it previously was open).
Warning
Warning of warranty void
The warranty of the analyser may be void if the analyser has been improperly installed
prior to initial use!
Turn on the analyser after proper installation by a person authorized by LAR.
Notice
Fault message “E1820 - Furnace temperature not reached” is shown when the system
is switched on. This message disappears once the furnace has reached the required
temperature. It does not need to be confirmed in the log book.
!
i

Table of Contents