62 User Manual QuickTOC
®
purity
ATEX 2 04E3920
5 Start-up
5.2 Checking the Pre-Fusing LAR | PROCESS ANALYSERS AG
5.2 Checking the Pre-Fusing
Before start-up can begin, it is important to ensure that correct pre-fusing has been installed at the op-
erator.
5.3 Checking the Installation Plate
Before start-up can be performed, it is important to ensure that no components have become loose or
suffered damage during transit. The housing and the components on the installation plate in the rear part
of the housing (Fig. 14, page 18) must also be checked.
Switching on the fuses
• Fuse Lock is removed
• All Fuses are switched on
Filling and installing the
reactor pipe
• Reactor Pipe is filled
• Reactor Pipe is installed
Completing the Furnace
System
• Furnace Head is installed
• Injection Port is installed
• Reactor Foot is installed
Installing the pump tubes • Pump tubes are installed
Tubing of the Analyser
• Tubing is performed like in Flow
Diagram
• Tubes are hand-screwed onto
the screwed joints
Connecting the Control Unit
and the Relays
• Control Unit and Relays are
connected
Connecting the Furnace
Emergency Cooling
• Emergency Cooling of the
Furnace is connected
Switching on the Analyser • Analyser is switched on
• Analyser is booted
Setting bypass of the Con-
trol Unit and switching into
the bypass mode
• Bypass for the Control Unit is set
and Bypass mode is ON
Rinsing the Injection Sys-
tem and Sample Tubes
• Injection System and Sample
Tubes are rinsed
Customizing application-
specific settings
• Hardware and Parameter
Settings are set
Checking Status
Parameters
• Carrier Gas IN / OUT: approx.
30 l/h (High Salt: approx. 20 l/h)
• Humidity: Actual < Target
• Gas Pressure: Actual < Target
• Zero Signal: 0 - 0.1 FSR
Perfoming a Calibration • Analyser is calibrated
Task Criteria OK Comment
Date: Signature: