56 User Manual QuickTOC
®
purity
ATEX 2 04E3920
4 Installation
4.5 Sample Inlet and Drain LAR | PROCESS ANALYSERS AG
• dew point: max. -5°C
• provided in the direct vicinity of the analyser
4.5 Sample Inlet and Drain
Please ensure that sample inlet and drain are depressurised and available in the direct vicinity of the
analyser.
4.6 Power Supply
A 115/230 V, 50/60 Hz mains voltage is required to use the analyser. The mains voltage for your analyser
is specified on the nameplate (Fig. 3, page 9) (on the right-hand side). You must provide a mains lead
and connect it to the mains connector (Fig. 15, page 19) on the installation plate (Fig. 14, page 18) of
the analyser.
Fig. 36: Electric Installation