04E3920 User Manual QuickTOC
®
purity
ATEX 2 87
LAR | PROCESS ANALYSERS AG
7 How to Work With the Analyser
7 How to Work With the Analyser
Once all installation and commissioning points have been met, the main switch (1) on the left side of the
analyser can be operated by an authorized LAR technician to "ON".
Fig. 50: Main switch
1