04E3920 User Manual QuickTOC
®
purity
ATEX 2 51
4 Installation
4.2 Site Selection - Ambient Conditions
LAR | PROCESS ANALYSERS AG
Warning
Warning of incorrect electric connections
The analyser may be damaged if it is not connected to the mains matching the
data stated on the nameplate.
Before the analyser is switched on, a check must be run on whether the local
voltage supply matches that on the nameplate.
If this power supply is not available, please contact your local partner or the
Technical Support of LAR (Chapter 15 on page 245).
Do not switch the analyser on before using it for the first time without the pre-
sence of a technician authorised by LAR - otherwise this voids the warranty of
your analyser.
!