LDI Intellectual Property.
Not for secondary distribution or replication, in part or entirety.
DIGISONDE-4D
SYSTEM MANUAL
VERSION 1.2.11
SECTION 3 - OPERATING INSTRUCTIONS 3-61
Table 3-8. Examples of Priority Analysis
RangeUT(10,20) for Schedule #1
Run #1 from 10 to 20 UT, run #2 from 20 to 22UT,
run #3 from 22 to 10 UT
RangeUT(14,22) for Schedule #2
RangeUT(14,22) for Schedule #2
Run #1 from 10 to 14 UT, run #2 from 14 to 22UT,
run #3 from 22 to 10 UT
RangeUT(10,20) for Schedule #1
Campaign Requests
3:113. One Campaign Request contains (a) Schedule Number, (b) Start UT, and (c) End UT for the schedule to
run. The campaign request overrides the existing SST planning rules. In addition to the campaign requests
typed into Campaign Table manually, DCART can accept external .RCR files (Remote Campaign Request) to
handle copious schedule switches that may be needed, for example, to support daily spacecraft overpasses. The
RCR files can be generated automatically by ADRES subsystem of the DIDBase repository using data from
orbit propagators.
Real-Time Display of Schedule Progression in SST Editor
3:114. Enabling “Real-Time” checkbox in DCART Timeline window switches it to display of schedule pro-
gression using current system clock time as the Timeline start and setting the Timeline end to a window of con-
figurable length (see Figure 3-47).
Figure 3-47: Real-Time Timeline Display of Schedule Progression