EasyManua.ls Logo

LDI DIGISONDE 4D - Powering up Procedure; Powering on the Main System

Default Icon
321 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LDI Intellectual Property.
Not for secondary distribution or replication, in part or entirety.
DIGISONDE-4D
SYSTEM MANUAL
VERSION 1.2.11
SECTION 2 - INSTALLATION, SETTING UP AND FIELD VALIDATION 2-13
POWERING UP PROCEDURE
POWERING ON THE MAIN SYSTEM
2:45. At this stage the sounder should be correctly connected to the:
a. correct power source, and all power switches in the OFF (down) position,
b. transmit and receive antennas,
c. GPS receiver, and
d. external computer monitor and keyboard.
2:46. Switch the ON/OFF switch on the rear I/O panel to ON. This will activate the cooling fans, switch the
power relay in the lower chassis, and boot the Control and Data computers.
2:47. At the completion of the boot-up sequence, which will take over one minute, the DCART control soft-
ware will display the welcome screen (Figure 2-6).
Figure 2-6: DCART Welcome Screen

Table of Contents