LDI Intellectual Property.
Not for secondary distribution or replication, in part or entirety.
DIGISONDE-4D
SYSTEM MANUAL
VERSION 1.2.11
SECTION 2 - INSTALLATION, SETTING UP AND FIELD VALIDATION 2-13
POWERING UP PROCEDURE
POWERING ON THE MAIN SYSTEM
2:45. At this stage the sounder should be correctly connected to the:
a. correct power source, and all power switches in the OFF (down) position,
b. transmit and receive antennas,
c. GPS receiver, and
d. external computer monitor and keyboard.
2:46. Switch the ON/OFF switch on the rear I/O panel to ON. This will activate the cooling fans, switch the
power relay in the lower chassis, and boot the Control and Data computers.
2:47. At the completion of the boot-up sequence, which will take over one minute, the DCART control soft-
ware will display the welcome screen (Figure 2-6).
Figure 2-6: DCART Welcome Screen