EasyManua.ls Logo

LDI DIGISONDE 4D - Drift Measurement; Valid Schedules Suboptimal for Science Observations

Default Icon
321 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LDI Intellectual Property.
Not for secondary distribution or replication, in part or entirety.
DIGISONDE-4D
SYSTEM MANUAL
VERSION 1.2.11
3-66 SECTION 3 - OPERATING INSTRUCTIONS
Drift measurement
3:125. Program design recommendations for the drift (Doppler skymap) measurements are summarized in
Table 3-10
Table 3-10. Program Design Recommendations for Drift Measurements
#
Recommendation
Motivation
Usage Implications
1
Set CIT time to 20 (day) or
40 seconds (night) by using
appropriate inter-pulse peri-
od, number of pulses per fre-
quency, and frequency multi-
plexing.
Improved Doppler resolution for a
better signal analysis and echo reso-
lution in skymaps
Higher EMI on radio systems, long-
er minimum running time. Doppler
frequency bandwidth at 40 sec CIT
may not be sufficient for polar loca-
tions.
VALID SCHEDULES SUBOPTIMAL FOR SCIENCE OBSERVATIONS
3:126. The following deficiencies of schedule designs are not reported automatically:
No loopback CCEQ program is included,
No BIT program is included,
Gain evaluation program uses constant gain setting different from subsequent science programs, and
CCEQ or Gain evaluation program use incompatible frequency range and step with subsequent science
programs.

Table of Contents