363-206-305 System Turnup:
NTP-032
Issue 3, June 2000 Page 7 of 10
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED . . . . FOR DETAILS, GO TO
At the DDM-2000 FiberReach shelf, use the ent-ulsdcc-l3:
command to designate the NSAP
AREA
field and level 2 IS-IS
routing, as required.
At the FT-2000 shelf, use the
CONFIGURATION-Set-ULSDCC-L3 command to designate the
L3 Area address and Level 2 IS parameters, as required.
17.
NOTE:
The rtrv-pm-line: command in the following procedure
displays performance monitoring data associated with the
OC-3/OC-12 lines terminated on the system.
DLP-515Perform end-to-end OC-3/OC-12 line test.
18. Repeat this procedure for the OC-3/OC-12 optical span being
established in the FT-2000 to FiberReach OC-3/OC-12 network.
Ensure that the last optical span connected to the FT-2000 host
shelf is connected to an OLIU in the opposite slot as the one in
the first OC-3 span (for example, slot 1A for the first span and slot
1B for the second span).
19.
NOTE:
Establishing service requires that the proper slots in each
terminating node be properly equipped with the correct
circuit pack(s) for the type of service being established. It
also requires numerous cross connections in each of the
nodes representing the path of the required service.
Additionally, transmission tests should be performed to verify
the continuity and quality of the established circuit.
The FiberReach OC-3/OC-12 linear extension is now ready for
initial service to be established.
Initial DS1 Service [System Turnup: NTP-004]
Initial T1 Service [System Turnup: NTP-013]
Initial HDSL Service [System Turnup: NTP-017]
Initial DS3 Service [System Turnup: NTP-025]
STS-3c Service [System Turnup: NTP-016]