DLP-502
: Detailed Level Procedure 363-206-305
Page 2 of 2 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
9. Disconnect power feeder from
P5
(green/white) power cables on FiberReach
Shelf.
10. Connect this power feeder to
P4
(slate/slate-black) on FiberReach Shelf.
11. Verify
PWR ON B
LED is now lit.
12.
!
WARNING:
P5
is now hot (
−
48V). Be sure that
P5
is dressed and stored in such a
way that shorts across and contact with the terminals is avoided.
Press
ACO/TST
pushbutton and verify that all LEDs on the
ECC2 USPNL
are
lit.
13. Connect the CIT and verify operation on the CIT interface.
14. Disconnect the CIT.
15.
STOP. YOU HAVE COMPLETED THIS PROCEDURE
.