363-206-305 Detailed Level Procedure:
DLP-515
Issue 3, June 2000 Page 3 of 4
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
Figure 2. Sample Report From rtrv-pm-line Command
5. Has performance-monitoring report been obtained from all shelf locations
associated with optical span(s) being tested?
If NO, continue with Step 6.
If YES, proceed to Step 7.
6. Repeat this procedure from Step 2 at other locations.
7. Did report indicate errors?
If YES, continue with Step 8.
If NO, STOP. YOU HAVE COMPLETED THIS PROCEDURE.
8. Trouble may be in optical fiber and/or connections. Trouble may also be in
OLIUs. If the report indicated trouble when the report was obtained from the
near end of the span, trouble may be in the receive direction (see Figure ). If
the report indicated trouble when the report was obtained from the far end of
the span, trouble may be in the transmit direction. Check optical fiber and
connections. Clean optical fiber connections [DLP-527]. If no trouble found in
the optical fibers, replace OLIU(s) [DLP-523] associated with the address
indicated in the report.
9. STOP. YOU HAVE COMPLETED THIS PROCEDURE.
/* Line Performance Monitoring Status Report
yy-mm-dd hh:mm:ss
Last initialized: day registers at
quarter hour registers at
yy-mm-dd hh:mm:ss
Address Start B2 CV B2 ES B2 ES B2 ES B2 SES B2 UAS
Time Type A Type B
=================================================================
=================================================================
address time nn... nn... nn... nn... nn... nn...
. . . . . . . .
. . . . . . . .
------------------------------------------------------------------
address time nn... nn... nn... nn... nn... nn...
. . . . . . . .
. . . . . . . .
*/
tpa 852348-01