363-206-305 Detailed Level Procedure:
DLP-542
Issue 3, June 2000 Page 3 of 4
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
3.
NOTE:
Make sure that there are no circuit packs stored lose in the shelf, and that
all operating circuit packs are securely latched in position.
NOTE:
Never leave the Wall DT unattended in the rotated position. Always return
it to the service position and reinstall at least the top attachment screws.
NOTE:
When ever sliding or rotating the Wall DT make sure that both the optical
fiber and DS1 cabling are not crimped or stressed in any way.
Carefully rotate the Wall DT 90 degrees until the Wall DT is in the normal
position. With both hands on the bottom of the Wall DT, carefully lift up on the
Wall DT so the pivot point leaves the rotation position, and slide the Wall DT
back until the pivot point reaches the service position. Allow the pivot point to
drop down into the service position (see Figure 2).
4.
NOTE:
When ever sliding or rotating the Wall DT make sure that both the optical
fiber and DS1 cabling are not crimped or stressed in any way.
Reinstall the four attachment screws that were removed from the front of the
Wall DT in Step 1.
5. STOP. YOU HAVE COMPLETED THIS PROCEDURE.