363-206-305 Detailed Level Procedures:
DLP-546
Issue 3, June 2000 Page 3 of 4
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
6. If required, seat a second (protection) DS3 circuit pack in Function Units
Group slot FN-2.
Response: FAULT LED on the DS3 circuit pack lights for about 20 seconds
then goes off. ACTIVE LED remains off.
7. STOP. YOU HAVE COMPLETED THIS PROCEDURE.
8.
NOTE:
Since cross connections associated with BBG19 DS3 circuit packs are
non-path-switched locked cross connections, a BBG19 DS3 circuit pack
installed in Function Units Group slot FN-1 at one terminating node is
associated with the BBG19 DS3 circuit pack in Function Units Group slot
FN-2 at the other terminating node.
NOTE:
If response is not correct in the following procedures, replace the BBG19
DS3 circuit pack.
Seat BBG19 DS3 circuit packs in Function Units Group slots FN-1 and FN-2.
Response: FAULT LED on the DS3 lights for about 20 seconds then goes off.
ACTIVE LED lights on DS3 circuit pack.
9. STOP. YOU HAVE COMPLETED THIS PROCEDURE.