9
UTILITY OPERATION
9.3 CC-Link utility
9.3.7 Operating Test screen
9 - 85
9
UTILITY OPERATION
10
FUNCTIONS AND
PROGRAMMING
11
OVERVIEW OF
MULTIPLE CPU
SYSTEM
12
MULTIPLE CPU
SYSTEM
CONFIGURATION
13
MULTIPLE CPU
SYSTEM
CONCEPT
14
COMMUNICATIONS
BETWEEN CPU
MODULES
15
PARAMETERS
ADDED FOR
MULTIPLE CPU
16
PRECAUTIONS FOR
USE OF AnS SERIES
MODULE
(b) Network test operation procedure
The network test can be executed only when the data link status ( Section
9.3.2) of the CC-Link module is "In data link" or "During Auto-Returning".
1) Setting
Select whether to start or stop data link and click the button to start the
network test.
2) Test result
The test result is displayed on the following screen.
Refer to the following for details of the error code.
Section 18.4.1
Figure 9.70 Network test screen
Figure 9.71 Network test result
OK