EasyManua.ls Logo

Mitsubishi Pajero Pinin 1999 - Page 907

Mitsubishi Pajero Pinin 1999
919 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HEATER, AIR CONDITIONER AND VENTILATION ±
Heater Unit, Blower Unit,
Resister and Evaporator
55-24
INSPECTION
RESISTOR CHECK
Use a circuit tester to measure the resistance between the
terminals as indicated below. Check that the measured value
is at the standard value.
Standard value:
Measurement terminal Standard value
Between terminals 1 and 3 (LO) 2.3
Between terminals 1 and 6 (ML) 1.0
Between terminals 1 and 4 (MH) 0.3
DISASSEMBLY AND REASSEMBLY
2
3
1
4
5
6
7
Disassembly steps
1. Cover
2. Heater core
3. Expansion valve
4. Joint
5. Cover
6. Evaporator
7. Air thermosensor
INSPECTION
AIR THERMOSENSOR CHECK
Measure the resistance between terminals under two or more
temperature conditions. The resistance should be close to
the values shown in the graph.
k
25
15
10
5
0
±10 0 10 20 30 40
_C
Resis-
tance
Temperature

Table of Contents

Related product manuals