EasyManua.ls Logo

Mitsubishi Pajero Pinin 1999 - Heater Unit, Blower Unit, Resister and Evaporator

Mitsubishi Pajero Pinin 1999
919 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HEATER, AIR CONDITIONER AND VENTILATION ±
Heater Unit, Blower Unit,
Resister and Evaporator
55-22
HEATER UNIT, BLOWER UNIT, RESISTER AND EVAPORATOR
REMOVAL AND INSTALLATION
Caution: SRS
When removing and installing the floor console assembly from vehicles equipped with SRS, do
not let it bump against the SRS-ECU or the components.
1
2
4
6
7
8
3
9
2
5
Piping connection
8
Compressor oil:
ZXL 200PG
OĆring
Heater unit and blower unit removal steps
D Discharging and Charging of
Refrigerant (Refer to P.55-10.)
D Discharging and Charging of Engine
Coolant (Refer to GROUP 14 ±
On-vehicle Service.)
D Engine Cover Removal and Installa-
tion (Refer to GROUP 11 ± Engine
Assembly.)
D Air Cleaner Assembly Removal and
Installation.
D Front Scuff Plate, Rear Scuff Plate,
Cowl Side Trim and Glove Box
Removal and Installation (Refer to
GROUP 52A ± Trims.)
D Front Seat Assembly (Driver's side)
Removal and Installation (Refer to
GROUP 52A ± Seat.)
D Shift Lever Assembly Removal and
Installation (Refer to GROUP 22 ±
Transmission Control.) <M/T>
D Selector Lever Assembly Removal
and Installation (Refer to GROUP 23
± Transmission Control.) <A/T>
D SRS±ECU (Refer to GROUP 52B.)
D Floor Carpet Removal and Installation.
1. Instrument panel assembly
(Refer to GROUP 52A.)
2. Intermediate connector
connections
3. Antenna feeder cable connection
4. DIN cable
5. Rear heater duct B
6. Rear heater duct A
7. Heater hoses connection
8. Refrigerant line connection
9. Blower unit, heater unit and deck
crossmember assembly

Table of Contents

Related product manuals