HEATER, AIR CONDITIONER AND VENTILATION ± Refrigerant Line
55-32
REFRIGERANT LINE
REMOVAL AND INSTALLATION
<L.H. DRIVE VEHICLES>
Pre-removal and Post-installation Operation
D Discharging and Charging of Refrigerant
(Refer to P.55-10.)
D Engine Cover Removal and Installation
(Refer to GROUP 11 ± Engine Assembly.)
D Air Cleaner Assembly Removal and Installation.
Compressor oil:
ZXL 200PG
3
4
5
Piping connection
OĆring
1
2