EasyManua.ls Logo

Siemens SONOLINE G50 - Page 103

Siemens SONOLINE G50
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Siemens 7482255 Rev 01 Page 9 of 16
October 2002
Chapter 5 - Installing Equipment Options
34. Reconnect the cables to the host module, with the exception of the USB
cable that was attached to the PPCL shielding plate (Figure 5-4).
35. Install the cables shown in Figure 5-10:
Power cable was installed at step 32.
Serial cable: *1 J2 A702P2 to A75P17
Ethernet cable (straight): *2 J30 LAN (NET)
Ethernet cable (cross): *3 J33 LAN (HOST)
USB cable: *4 J32 IPPC (LOW)
VGA cable: J31 IPPC VGA
36. Verify that all cable retainer screws are tightened.
37. Verify that all unsecured cables are properly installed.
38. Clamp the following cables together using the cable clamp shown in the
left-hand photograph of Figure 5-9:
DIMAQ-IP power cable
Serial cable attached to J2
Cable attached to J1007
Cable attached to J1008
Cable attached to J1010
39. Tilt and swivel the system monitor while observing the monitor cable at its
point of attachment to the monitor: Verify that the monitor cable is free to
move as the monitor is tilted and swiveled.
40. Verify that all cables are securely connected and protected from damage.
41. Reinstall the host module cover that was removed in step 3.

Table of Contents

Other manuals for Siemens SONOLINE G50

Related product manuals