Page 6 of 6 7482255 Rev 01 Siemens
October 2002
Planned Maintenance Checklist
Passed Failed N/A
Preparation
Discuss customer concerns
Clean the system
Clean the subsystems
Clean the air filter element.
Clean the track ball.
Clean and Inspect
Transducers
Safety Checks
Inspect the wheels and wheel locks.
Verify that the monitor is secure.
Perform electrical safety test:
Field Electrical Safety Test Procedure
(p/n 7482776)
G60 S Electrical Safety Test Limits
(p/n 7482784)
Field Electrical Safety Test Report
(p/n 7482768)
System Test
Calibration is successful.
Image and overlay okay.
Time and date are correct.
Functional test of controls successful.
Transducer operational check okay.
Freeze function okay.
Peripherals operate properly.
Preset data okay.
Protective ground wire operational.