EasyManua.ls Logo

Simrad SX90 - INSTALLATION REV C - Page 239

Simrad SX90 - INSTALLATION REV C
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index
ACmainstothe
UninterruptedPower
Supply,73
adjustingthe
stabilisationsensor
offset,124
alignmentofthesonar
picture,122
audiosystem
installation,61
BeamformerUnit
installation,59
BeamformerUnittothe
TransceiverUnit,85
cabletoexternalaudio
system,89
cablesfromtheInterface
UnittotheProcessor
Unit,77
checkhoist/lower
system,112–113
checkOperatorPanel,104
deningownship
parameters,125
displayunit
installation,57
Ethernetcablefor
scienticoutput,89
naltest
introduction,141
groundtotheInterface
Unit,83
groundtotheOperating
Panel,84
installation,16
Transceiverunit,49
InterfaceUnit
installation,60
noise/speedcurve
measurements,147
OperatingPanel
installation,57
OperatingPanel“dual”
cable,76
ProcessorUnit
installation,58
ProcessorUnittothe
BeamformerUnit,78
receivingvoltage
response
measurements,145
self-noisetest,118
sourcelevel
measurements,141
specifyinterface
parameters,129
starthullunit,92
startthesonarsystem,119
startwheelhouseunits,102
start-upsonar,92
TransceiverUnittothe
MotorControlUnit,87
USBcablefromthe
OperatingPaneltothe
ProcessorUnit,75
videocablefromthe
ProcessorUnittothe
colourdisplay,74
ProcessorUnit
installation,58
location,54
outlinedimensions,158
Protection
againstESD,187
temperature,185
Pulselog,21
interface
setup,134
test,134
Purpose
thismanual,11,13
R
Radiobuoysystem
interface
option,25
Radiobuoys
connection,193
interface
setup,139
test,139
RadioFrequency
interference
requirements,215
Range
extended
option,23
Re-packaging
equipment,185
Receipt
equipment,27
Receivingvoltageresponse
measurements,145
Requiredunits
notincludedwith
delivery,19
Requirements
cables,214
forinstallation,28
wheelhouseunits
installation,53
Responsibility
compassdeviation,28
equipment,27
Returning
acircuitboard,187
RJ45
plug,208
Ryokusei
connection,193
interface
option,25
setup,139
test,139
S
Scienticinterface
option,23
Scopeofsupply,19
Self-noise
testprocedure,118
Sensor
cables,190
Sensors
interface
options,23
Serialline
sonar,212
SERPE
connection,193
interface
option,25
setup,139
test,139
Setupprocedure
interface
(D)GPSpositioning,137
(D)GPSspeed,134
Ariane,139
catchmonitoring
system,139
coursegyro,136
currentmeter,140
digitalGPS,137
echosounder,137
ES60,137
FS20/25,138
GPSpositioning,137
headingsensor,136
ITI,138
KaijoDCG-200,140
PI30,139
PI32,139
PI44,139
PI54,139
positioningsystem,137
pulselog,134
radiobuoys,139
Ryokusei,139
SERPE,139
speedlog,134
trawlsystem,138
307531/C
237

Table of Contents

Related product manuals