EasyManua.ls Logo

Suzuki GSF1250 - Page 215

Suzuki GSF1250
685 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Mechanical: 1D-13
Assembly
Assemble the throttle body in the reverse order of
disassembly. Pay attention to the following points:
Apply a thin coat of engine oil to the O-ring.
With the STV fully closed, install the STP sensor (1)
and tighten the STP sensor mounting screw to the
specified torque.
NOTE
Align the secondary throttle shaft end “A”
with the groove “B” of STP sensor.
Apply grease to the secondary throttle
shaft end “A” if necessary.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Special tool
: 09930–11950 (Torx wrench)
Tightening torque
STP sensor mounting screw: 3.5 N·m (0.35 kgf-
m, 2.5 lb-ft)
NOTE
Make sure the STP valve open or close
smoothly. If the STP sensor adjustment is
necessary, refer to “STP Sensor Adjustment
in Section 1C (Page 1C-4)”.
Apply a thin coat of engine oil to the O-rings and
install the ISC valve assembly.
CAUTION
!
Replace the O-rings with new ones.
Special tool
: 09930–11950 (Torx wrench)
Tightening torque
ISC valve mounting screw (a): 3.5 N·m (0.35 kgf-
m, 2.5 lb-ft)
Apply a thin coat of engine oil to the O-rings and
install the plate.
CAUTION
!
Replace the O-rings with new ones.
NOTE
The boss “C” of the outside.
Connect the ISC valve hoses securely.
1
“A”
“B”
I718H1140335-01
I718H1140336-01
(a)
I718H1140337-02
“C”
I718H1140338-01
I718H1140339-02

Table of Contents

Other manuals for Suzuki GSF1250

Related product manuals