EasyManua.ls Logo

Suzuki GSF1250 - Page 271

Suzuki GSF1250
685 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Mechanical: 1D-69
Water Pump
Apply SUZUKI SUPER GREASE to the O-ring.
CAUTION
!
Replace the O-ring with a new one.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Tighten the water pump mounting bolts to the
specified torque.
Tightening torque
Water pump mounting bolt (a): 10 N·m (1.0 kgf-
m, 7.0 lb-ft)
Starter
Install the starter component parts (1). Refer to
“Starter Clutch Removal and Installation in Section 1I
(Page 1I-10)”.
Generator
Install the generator component parts (1). Refer to
“Generator Removal and Installation in Section 1J
(Page 1J-4)”.
Gearshift
Install the gearshift cam stopper (1), bolt (2), washer
(3) and return spring (4).
NOTE
Hook the return spring end “A” to the
stopper (1).
Tightening torque
Gearshift cam stopper bolt (a): 10 N·m (1.0 kgf-
m, 7.0 lb-ft)
Check the gearshift cam stopper moves smoothly.
Locate the gearshift cam in the neutral position.
I718H1140239-01
(a)
I718H1140403-01
1
I718H1140242-01
1
I718H1140243-01
1
2
3
4
I718H1140244-01
1
“A”
(a)
I718H1140018-02

Table of Contents

Other manuals for Suzuki GSF1250

Related product manuals