EasyManua.ls Logo

ABB ACS6000 - Page 19

ABB ACS6000
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-4 Top view of DC busbar configuration 1 104
Figure 5-5 Top view DC busbar configurations 2 (A), 3 (B)
and 4 (C) 105
Figure 5-6 Ground busbar joints 106
Figure 5-7 AC busbar joints between the COU/TEU and LSU
(5/7/9 MVA). 107
Figure 5-8 AC busbar joints between the COU/TEU and LSU
(14 MVA). 108
Figure 5-9 Air-to-air heat exchanger (type LT-5-5165-UL) 112
Figure 5-10 Tools for installing an air-to-air heat exchanger 112
Figure 5-11 Correct and incorrect cable installation 114
Figure 5-12 ARU/INU/IFU cable routing 116
Figure 5-13 LSU cable routing 116
Figure 5-14 Air-to-air heat exchangers (type LT-5-5165-UL) 117
Figure 5-15 Tools for removing an air-to-air heat exchanger 118
Figure 5-16 Installation example of transformers in an air-to-air
heat exchanger 120
Figure 5-17 Connect wires to terminal block 121
Figure 5-18 Pressure relief vents 121
Figure 5-19 Tools required to fasten the pressure relief vent
to the roof 122
Figure 5-20 Installation example of pressure relief vents 122
Figure 5-21 Attach sealing tape to the joining crossbar (1) 123
Figure 5-22 Roof joints (1) 124
Figure 5-23 Roof attachment parts 125
Figure 5-24 Recommended ceiling and wall fixings 126
Figure 6-1 Phase module on lift table 127
Figure 6-2 Grounding the input side (A) and output side (B)
of the drive system 129
Figure 6-3 System ground connection (1) in a 600 mm TEU 130

Table of Contents

Related product manuals