EasyManua.ls Logo

AGI BCX3 1549 - Page 38

AGI BCX3 1549
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38 8210-00020 R1
Install the Weather Guards on the Tube Brackets
Assembly Notes:
Install the types of weather guard sections as shown on your particular conveyor model.
Important
Overlap the adjacent weather guard sections and align the holes as shown in the figure.
Connect each weather guard section to the tube brackets using a uni-mount plate cast, 3/8" x 1-1/4" cap
screw, and 3/8" lock nut. Leave the 3/8" lock nuts loose. (See Install the Weather Guards on the Tube
Brackets on page 38.)
Confirm all weather guard mount bar holes are aligned.
Tighten the 3/8" lock nuts after all of the weather guards have been installed.
A
Uni-Mount Plate Cast
2
3/8" Nylon Lock Nut (GR8)
1
3/8" x 1-1/4" Flat Head Socket Cap Screw
1
A
2
IMPORTANT:
IMPORTANT:
IMPORTANT:
Align holes
Bevelled edge orientation
Proper overlap
Belt travel direction
Belt travel direction through weather guards
Spout
Hopper
3. ASSEMBLY FIELD LOADER S-DRIVE PORTABLE GRAIN BELT CONVEYOR

Table of Contents

Related product manuals