EasyManuals Logo

Agilent Technologies 2100 Maintenance And Troubleshooting Guide

Agilent Technologies 2100
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #132 background imageLoading...
Page #132 background image
132 Maintenance and Troubleshooting
9
Maintenance of the Chip Priming Station
Overview
Overview
Regular cleaning procedures are necessary to maintain the performance of the
chip priming station. The table below gives an overview on the different
maintenance procedures.
Procedure Time interval Or if...
Replacing the syringe With each new kit
Latest every 3 months
...syringe is broken, see “Replacing the
Syringe” on page 133.
Cleaning the syringe adapter Every 3 months
Replacing the syringe adapter ...adapter is clogged with dried gel or damaged,
see “Replacing the Syringe Adapter” on page 136.
Replacing the gasket Every 3 months ...gasket is damaged, torn or contaminated with
dried gel, see “Replacing the Gasket” on
page 137.
Checking the chip priming station for
proper seal
Every 4 weeks ...gasket, syringe adapter or syringe was replaced,
see “Checking the Chip Priming Station for Proper
Performance - Seal Test” on page 139.

Table of Contents

Other manuals for Agilent Technologies 2100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 2100 and is the answer not in the manual?

Agilent Technologies 2100 Specifications

General IconGeneral
BrandAgilent Technologies
Model2100
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals