REQUIREMENTS
Implement lifted in the workshop
Secure the lifted implement and components
against lowering.
1. Hold the fertiliser coulter
in the set position,
Loosen the bolts
.
2. Move the fertiliser coulter to the desired position.
3. Hold the fertiliser coulter in the desired
position,
Tighten the bolts.
4. Make the same adjustment for all fertiliser
coulters.
or
Put the fertiliser placement depth in the tracks in
the desired position.
CMS-I-00001934
6.4.23.2 Coulter pressure in the tractor track
Depending on the implement equipment, the coulter
pressure in the track can be adjusted separately.
1. Switch on the fan.
2. To set the coulter pressure beside the tractor
tracks to zero,
refer to the ISOBUS operating manual "Adjusting
the coulter pressure".
NOTE
The working range is between 10 and 50 bar.
3. To adjust the additional coulter pressure in the
track,
put the coulter pressure in the desired position on
the setting screw
.
The pressure gauge
shows the additional
coulter pressure in the tractor tracks.
CMS-I-00005532
CMS-T-00007947-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
146