EasyManua.ls Logo

Amazone Precea 3000 - Page 157

Amazone Precea 3000
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Loosen the tension belt
2
from the top link
1
and lower link
3
and remove it.
2
1
3
CMS-I-00005312
5. When the hydraulic coulter pressure system is
closed again,
connect the hydraulic plugs
1
on both
implement sections to a vent hose.
6. To set the coulter pressure to zero,
refer to the ISOBUS operating manual "Adjusting
the coulter pressure".
7. Switch on the fan at 2000 rpm.
NOTE
Ensure that the oil supply in the hydraulic unit is
sufficient.
8. To vent the coulter pressure system on both
sides,
move the seeding units on both implement
sections up and down consecutively with a crane.
CMS-I-00004129
6.4.23.4.4 Establishing the air and fertiliser supply on the rear hopper with central drive
1. Open the sliding shutter
1
on the fertiliser
metering unit.
CMS-I-00003915
CMS-T-00005487-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
151

Table of Contents

Related product manuals