EasyManua.ls Logo

Amazone Precea 3000 - Page 161

Amazone Precea 3000
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the coulters with the PreTeC transport dolly
is described in the following.
11. To set the fertiliser coulters to the topmost
position,
see "Adjusting the fertiliser placement depth".
12. To set the coulter pressure to the highest value,
see "Adjusting the coulter pressure
mechanically".
13. To put the placement depth into parking
position
P
,
see "Adjusting the seed placement depth"
14. To move the catch roller to position
A
,
see "Adjusting the catch roller"
15. Raise the implement.
16. Position the transport dolly
2
under the coulter
to be removed.
17. lower the implement.
The depth control wheels
3
are resting on the
transport dolly.
18. Hook the belts
1
onto the coulter.
CMS-I-00005134
19. Remove the bolts
1
.
20. Remove the coulter bracket
2
.
CMS-I-00004135
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
155

Table of Contents

Related product manuals